![]() |
![]() |
![]() |
|
![]() |
![]() |
SIP Creation became the culmination of efforts applied during last years by Ukraine and the international community with the purpose of development economically and ecologically acceptable approach to Shelter of ChNPP Unit 4 problems solution. 1. Investigation of the Shelter object condition and monitoring of an environment. 1994. European Community Commission announced the tender on Feasibility Study development for the first stages of the Concept of Shelter object transformation in ecologically safe system – stabilization of existing Shelter condition and "Shelter - 2" construction. Consortium "Alliance" led by the French company “Campenon Bernard SGE ” became the winner of the tender. Feasibility Study development on object transformation is completed and Consortium "Alliance" submitted report, which is topical up to the date. Its fundamental conclusions: 1. Existing Shelter is unstable and it isn’t earthquake-proof. Urgent measures are necessary, an option “don’t undertake any measures, that is to do nothing is not acceptable”. 2. In view of high radiation level and a real condition of existing constructions long-term stabilization of "Shelter" considered as impracticable. Constructions of existing "Shelter" don’t ensure possibility of Radioactive Waste removal, lifetime of which makes tens thousand years. 3. Construction of a new protective encasement, allowing Unit four dismantling is necessary. 4. Designing and construction of the second shelter is extremely difficult, multipronged problem, covers both initial site clearing and Radioactive Wastes removal. Prior to the "Shelter - 2" construction beginning it is necessary to organize wastes processing and storage. 5. Ukraine cannot independently provide such project financing. This question needs to be considered critical. International community should demonstrate the desire to assist Ukraine to solve the problems connected to Chernobyl accident. A real choice today is establishment and support of political will, financial guarantees for all period of the project realization. On September 11, 1995 European Commission Session was held in Brussels at participation of Ukrainian delegation for definition and coordination of the subsequent actions on the basis of Consortium "Alliance" study. Result of this meeting became the agreement, signed by European Commission with a consortium "Alliance" and “Trischler und Partner GmbH” company on short- and long-term measures development. According to the Decision of the Cabinet of Ministers of Ukraine (¹696-p, dated 14.11.95) functions of the works Customer on Shelter transformation into ecologically safe system are transferred to Gosatom and DS ChNPP. According to signed in December, 1995 Memorandum of Understanding between Government of Ukraine, G7 countries Governments and European Commission on Chernobyl NPP shutdown” within the framework of TACIS Project “Chernobyl Unit 4, Short- and long-term measures – Measures 2+4” the Recommended Course of Actions was developed in which potential short- and long-term measures have been determined and the complex of urgent measures, consisted of the following phases was proposed: June, 1997. "Shelter Implementation Plan” (SIP), developed sequential to the project “Chernobyl Unit 4, Short- and long-term Measures – Measures 2+4 ” in cooperation with European Commission (EC), Ukraine, USA and team of international experts was accepted at G7 meeting. This plan defined the basic concept, including a number of steps aimed on Shelter object transformation into ecologically safe condition. Two fundamental tasks were posed during plan development: On November 20, 1997 Pledging Conference of donors-countries taken obligations on funds allocation for this plan implementation in specially established Chernobyl Shelter Fund (CSF) was held in New York. Fund administration was entrusted to the European Bank for Reconstruction and Development (EBRD). Agreement between Ukraine and European Bank for Reconstruction and Development on Fund activity (“Framework Agreement”) also has been signed at the Conference. Creation date : 22/10/2004 - 14:28 |
29016 visitors 7 visitors online
Webmaster : Information Department E-mail : ipo_3@chnpp.gov.ua
|
![]() |
![]() |